1. Drip edge
Metal edge at eaves and rakes. Required by the International Residential Code on most shingle roofs, but often left off estimates.
2. Starter strip
A separate adhesive course at the eaves and rakes. Estimates sometimes assume it's covered by the shingle waste factor; manufacturers specify a dedicated starter.
3. Hip and ridge cap
Pre-formed cap shingles priced per linear foot — not field shingles cut into pieces.
4. Ice and water shield
Self-adhering membrane in valleys and around penetrations; often required by manufacturer instructions.
5. Flashing
Step flashing at walls, counter flashing and chimney flashing are usually replaced with the roof, not reused.
6. Vents and pipe jacks
Every vent, exhaust cap and pipe boot is its own line item.
7. Steep and high charges
Extra labor for slopes 7/12 and steeper and for roofs two or more stories up.
8. Additional layers
Each extra layer of shingles torn off costs extra labor and disposal.
9. Waste factor
Cut-up roofs with hips, valleys and dormers waste more material than simple gables.
10. Decking
Rotten or damaged decking found during tear-off should be supplemented with photos.
11. Detach and reset
Satellite dishes, solar panels, gutters and lights that must be removed and reinstalled.
12. Overhead and profit
General contractor coordination costs on multi-trade claims, commonly 10% plus 10%.